Burnham Taylor 345KV Design

HBK was responsible for the development of 6 miles of underground infrastructure designed for a 345kV XLPE electrical transmission line in downtown Chicago.  The team’s responsibilities included the planning, implementation and oversight of all of the subsurface utility engineering (SUE) work.  This installation encompassed engineered shored excavations of varying depth and types including deep trenches, manhole shafts, box tunnels, drilled soldier pile shafts and directional drilling methods.  Additionally HBK was able to plan and design the temporary support & protection systems of existing utility infrastructure that could be affected during construction activities that would occur over the course of the…